Our Process

We design and build the pool and everything around it—on one timeline, with one accountable lead—so your backyard works on day one.

Learn more about the pool planning, design, and installation process below.

Typical Timeline

  • Design: 2–6 weeks

  • Permits/Utilities: 2–8+ weeks

  • Build to Reveal: 3–8 weeks
    We’ll share a project-specific schedule after design approval.

The Pool Design & Installation Process

A construction site showing a blue above-ground pool, construction equipment, a mini excavator, and workers, with trees and a cloudy sky in the background.

What We Handle (so you don’t have to)

Permits • HOA docs • Engineering/surveys • Excavation • Pool set/steel • Plumbing/electric/gas • Coping/deck • Drainage • Fencing/gates • Lighting/power • Structures (pergola/cabana/kitchen) • Planting & lawn restoration • Startup & training